Xingfa will continue to lean management and provide good quality aluminium profile.
Since its establishment, Guangdong Xingfa Aluminium (Henan) Co., Ltd. has been in a tight state of powder coating production capacity for a long time. After the transformation of Horizontal Line 1 in 2024, the daily output decreased, causing problems such as a decline in order delivery rate, backlog of semi-finished product inventory, poor logistics turnover, and fluctuations in quality pass rate, seriously restricting business efficiency and order delivery. To solve this problem, the powder coating team of Henan Company has explored many measures, but these measures lacked scientific rigor, a systematic approach, and sustainable results, leading to minimal impact. Under the influence of the group's promotion of the lean management policy, Henan Company organized the powder coating team to carry out lean management to enhance the production capacity project in April. Through refined management and organizational improvement, using lean tools such as PSP and 5Why to deeply analyze the root causes of the problem and implement targeted solutions, the team successfully increased the daily output of the powder coating line by 20%, and the production bottleneck was solved.
1. Project Goal Setting and Team Building
Scientifically setting goals is the key to a project's success. Starting from lean thinking and based on actual production, Henan Company conducted theoretical calculations on its powder coating line, calculated the theoretical production capacity of the powder coating line, and summarized the best practical production capacity based on historical data queries. This enabled the team to set scientifically grounded project goals.
The teamwork is an important guarantee for the success of the project. To ensure the achievement of goals, project teams at different levels were established, including workshop managers, class supervisors,and team members, fully leveraging the expertise of personnel across different levels. At the same time, a project supervisor role was established, with the general manager serving as the project supervisor to drive continuous improvement of the project.

The Meeting of Project Promotion
2. Project Research and Problem Analysis
The PSP tool is a systematic problem-solving method used in lean project implementation, and the project is carried out according to the PSP tool concept. Firstly, conduct research on the background of the project issues, including personnel, equipment, materials, operating methods, and management, and inquire about the opinions of frontline employees on low output and increasing output. Then organize the project team to use tools such as fishbone diagrams, Pareto charts, 5W2H, and 5Why analysis etc. to deeply analyze the root causes. The analysis revealed that material shelving issues, process control deficiencies, and insufficient personnel supervision were key factors limiting production capacity.
3. Implementation of Measures and Continuous Improvement
(1)Solving the Problem of Material Shelving
The main reason for the issue of material shelving is the inability to shelve the entire order and production gaps. To address this problem, the following measures have been taken:
1)Full-order Shelving Implementation
In response to the issue of the vertical spraying line not being able to go online as a whole, through 5 Whys analysis, it was found that the reason was due to excessive accumulation of stagnant materials and low efficiency of empty frame transportation, which were not cleaned up in a timely manner. Therefore, the stacking area was reorganized, material flow standards were clarified, and the processes of empty frame transportation and semi-finished frame storage were optimized to ensure the continuous online operation of the entire order and solve the problem of shelving.
2)Reduce Burrs and Particles on the Coating Lines
Source-level measures were implemented to reduce burrs and particles in the raw materials. These actions helped minimize waste during polishing and coating, reduce labor intensity during shelving, and improve hanging efficiency.
3) Strict Control of Production Gaps
One is to control the phenomenon of idle time during shift handover, and the other is to prohibit the existence of idle time during the production process without changing the powder. As a result of these measures, the single-shift hanging capacity of the vertical coating line increased by 27%, significantly improving production efficiency.

Reduce Gaps and Increase Spray Production
4) Improve Packaging Efficiency
After the improvement of material shelving efficiency, the efficiency of post-spraying packaging became the bottleneck limiting production capacity utilization. By introducing flow packaging machines and extending production assessment to the packaging process, the two key issues that constrained efficiency by 80% have been solved, significantly improving packaging efficiency.
(2)Strengthen Process Control and Improve Quality Stability
Strengthen the management of production scheduling orders and fix production lines for the same color; The trial coating sample and actual production are carried out on the same production line, thereby reducing coating color difference and minimizing backflow. Adjust the coating process according to different customer needs, and form process standards for solidification to stabilize product quality.
(3)Strengthen Supervision and Optimize the Grassroots Management of the Coating Line from “2+4 Management Mode” to “1+2 Management Mode”
In the lean management, it is proposed that "Enterprises Should also Prune Branches". Henan Company integrates the functions of putting on and taking off all coating lines according to the actual needs of workshop processes, and sets up dedicated team leaders to manage and supervise the putting on and taking off of lines. At the same time, the coating lines originally belonging to two production workshops and the homeroom teacher position will be managed by one person. This move shortens the management chain, unifies work standards, and forms a supervision mechanism. After the reform, the number of grassroots management personnel will be reduced by 50%, and both production efficiency and output will be improved.
4. Formation Mechanism and Solidification of Achievements
The solidification and replication promotion of achievements are also important contents of the three precision management, which can ensure the long-term effectiveness of the project. The project team solidifies the achievements during the project implementation, mainly resulting in the following achievements:
(1)Mechanism of material shelving management
(2)Standards of special profile process
(3)Management and assessment mechanisms for coating lines.
(4)A daily clearing and settlement mechanism for team issues
(5)Data driven decision-making mechanism
(6)Quality monitoring and elimination mechanism for powder suppliers
5. Continuous Improvement and Deepening of Lean Management
The lean management is a systematic and long-term transformation project. Xingfa Aluminium Henan company will continue to steadfastly implement the requirements of the group's deployment, deepen the implementation of the "Three Precision" concept, continuously consolidate the management foundation, unleash the potential of the production line, and stimulate organizational efficiency. In the next stage, Henan company will promote refined management with higher standards, consolidate and build upon these achievements with more practical and targeted measures, and strive to demonstrate greater responsibility and make greater contributions in the new journey of high-quality development.